We were asked here by our client to provide access up and around the flache of the Barony Halls for maintenance works.

We set off from the car park area bridging over the low level roof with 750mm diamond beams fixed onto the wall using Apollo bolts to allow us a boarded platform at the main gutter level. From there we then stepped up the steep pitch of the roof to form a saddle over the ridge and down the back side. Due to the height and location of the scaffolding facing onto one of Glasgow busiest streets we fixed all boards screwing them onto the transom to prevent wind uplift.